 Room for the future

In biology, growth means the “natural increase in size of a living organism”. This is also a fitting image for a successful company. At least, the history of Optima is characterized by continuous expansion – with particularly significant boosts over the last 20 years. It is also a story of building and buildings. The first structural expansion took place at the headquarters in Schwäbisch Hall; however, as the company grew, other locations in Germany and around the world were expanded.

In 1959, the relocation from the former headquarters at Alte Reifensteige 7 to the new industrial area on the Westhöhe marked the beginning of a new era. The spacious and modern new building in the Steinbeisweg drew attention. Successful developments, especially the Clipfix packaging equipment played a major role in the expansion. It was obvious, even back then, that an Optima facility must both be functional and meet the highest aesthetic requirements.

Throughout the 60s, 70s and 80s, continued growth required constant modifications, expansions, and even temporary leasing of property and halls. Improvisation can bridge things for a while, but in the 90s, when Optima acquired Inova-Pac-Systeme GmbH, the available space had finally reached its limits. The company found ideal conditions for its new subsidiary, which was the nuclei of Optima Pharma, in the new industrial area Solpark. Construction began in 1999 and was completed at the beginning of the new millennium.

22 years, several ground-breaking ceremonies and construction projects later, today’s Optima Pharma in the Solpark is in its fifth building phase. Other divisions also expanded during that time, in some cases substantially. 

No matter what is being built, renovated or rebuilt, one rule always applies, says Matthias Dietz, facility manager at Optima: construction work is carried out within the budget and scheduled time frame. Sustainable construction, including solar panels, is one of the core principles whenever possible.

These pages provide insight into some of Optima’s diverse construction projects over the years. However, by no means can all international projects be named here.

Well built

A quick overview of key Optima Group construction developments:

Optima Headquarters /Optima nonwovens

Steinbeisweg 24, Schwäbisch Hall

Since 1960

1963        Doubling the hall space

1982        Hall expansion

1987/ 88    West and middle extension

2015        North gap hall extension

2016        Purchased neighboring property with assembly hall

2019 –21    Roof renovation, converted warehouse for assembly

172,200 sq ft

 

Fallback area for large and special orders

53,800 sq ft

 

Optima pharma

Otto-Hahn-Straße 1, Schwäbisch Hall

2000     Office and assembly hall     

2007     Doubling of hall and office space

2012     Hall extension

2019     CSPE hall with office space

 

Geschwister-Scholl-Straße 90, Schwäbisch Hall

2022     CSPE hall with office space

91,500 sq ft

 

Vor dem Langen Loh 8, Gladenbach-Mornshausen

2007     First BA (formerly Klee GmbH)

2021     Second BA

43,000 SQ FT

 

Optima consumer

Geschwister-Scholl-Straße 89, Schwäbisch Hall

2011 Kugler GmbH (subsidiary) hall extension 

2011 Optima consumer GmbH, administration, extension to existing building (former SF Vision and Kugler GmbH)

107,600 sq ft

 

Training center & Optima life science

Kolpingstraße 23 Schwäbisch Hall

2011 Purchase of hall 

96,800 sq ft

 

Materials management

Alfred-Leikam-Straße 36, Schwäbisch Hall

2018 New office space, warehouse and commissioning areas

86,100 sq ft

 

France

Comines 

2010 Manufacturing, office and assembly areas

43,000 sq ft

 

Brazil

Vinhedo

2000   First Building

2005   Duplication of assembly and office space

2008   New building for electrical assembly

2010   New building for warehouse and machining/production area incl. loading area

2011   New building for mechanical and electrical assembly

96,800 sq ft

 

Mexico

Mexico City

2001

9,650 sq ft

 

USA

Green Bay

1990   Opco building

1992   Office and Warehouse Alterations

1995   Building addition: New shop

2017   Building addition: Office/assembly

32,300 sq ft

 

China

Shanghai

2007   Office and Workshop 

53,800 sq ft

Office space at other locations:

MALAYSIA, 

Lunas, Kedah 3,200 sq ft 

JAPAN,

Kyoto 1,000 sq ft

Korea,

Seoul 2,100 sq ft

India,

Bangalore 3,200 sq ft

Total amount invested in building projects since 2000:

> 100 million euros